Design of parking lots, industrial areas and access roads. As part of the contract, an industrial area with concrete pavement, its access roads and two parking lots for vehicles were designed.




We develop high-precision road, street and square construction plans, adapting to both the specifics of the urban environment and the requirements of industrial zones. Each project is based on careful research to ensure maximum functionality and safety.
Development of plans for the construction of roads, streets and squares.
Creation of traffic organization schemes.
Calculations and optimization of pavement structures.
Coordination of the construction plan with all necessary institutions.
Valmiera Industrial Park
Design of parking lots, industrial areas and access roads. As part of the contract, an industrial area with concrete pavement, its access roads and two parking lots for vehicles were designed.
Customer: Valmiera County Municipality
Role in the construction plan: Responsible Construction Project Manager, Roads Department (TS-CD) Manager, Responsible Author Supervisor
Address: ”"Valmiera Industrial Park", Valmiera, Valmiera region, LV-4224 (registration number 9662 002 0613)
Total area: 175,707 m2
Construction work amount excluding VAT: EUR 14,897,903.69
Work period: 01.2023. – 01.2024.
Mezezera Street
Mežezera Street from Mirdzas Ķempes Street to Mežezera Street 6 and courtyards at Mežezera Street 6 and Mežezera Street 8, Riga. As part of the project, a new section of Mežezera Street was designed, as well as a courtyard with parking lots and pedestrian walkways.
Customer: SIA “Kaamos K10”
Role in the construction plan: Responsible Construction Project Manager, Head of Roads Department (TS-CD)
Address: Mežezera Street, Mežezera Street 6 and Mežezera Street 8, Riga
Total area: 3,724 m2
Work period: 10.2021. – 03.2023.
Riga Makerspace
Reconstruction of the building for the creation of the prototyping workshop “Riga Makersapce” and territory design, Aristīda Briāna Street 13, Riga.
Customer: VAS “State Real Estate”
Role in the construction plan: Road Section (TS-CD) Manager
Address: Aristida Briana Street 13, Riga
Total area: 202 m2
Construction work amount excluding VAT: EUR 10,153,755.48
Work period: 05.2020. – 01.2022.